[1]
Cakrawinata, A.D.A., Kurniyaningrum, E. , Yuwono, B.E. and Pontan, D. 2024. Simulation Model of Precast Concrete Element Delivery on Time and Operational Costs of the Precast Yard in the Board Mill Construction Project. Eduvest - Journal of Universal Studies. 4, 5 (May 2024), 4392–4420. DOI:https://doi.org/10.59188/eduvest.v4i5.1299.