[1]
Ariza, F., Suroso, A. and Amin, M. 2025. Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration. Eduvest - Journal of Universal Studies. 5, 3 (Mar. 2025), 2716–2730. DOI:https://doi.org/10.59188/eduvest.v5i3.1754.