Ariza, F., Suroso, A. ., & Amin, M. . (2025). Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration. Eduvest - Journal of Universal Studies, 5(3), 2716–2730. https://doi.org/10.59188/eduvest.v5i3.1754