Ariza, F., Suroso, A. . and Amin, M. . (2025) “Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration”, Eduvest - Journal of Universal Studies, 5(3), pp. 2716–2730. doi: 10.59188/eduvest.v5i3.1754.