Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration

Authors

  • Franrizka Ariza Universitas Mercu Buana Jakarta
  • Agus Suroso Faculty of Engineering, Universitas Mercu Buana Jakarta, Indonesia
  • Mawardi Amin Faculty of Engineering, Universitas Mercu Buana Jakarta, Indonesia

DOI:

https://doi.org/10.59188/eduvest.v5i3.1754

Keywords:

critical chain project management, BIM 3D, last planner system, high rise building, contractor, project implementation time effectiveness

Abstract

This study examines the effectiveness of project implementation by evaluating the impact of Critical Chain Project Management (CCPM), Building Information Modeling (BIM), and the Last Planner System (LPS) on contractor performance and the timeliness of high-rise building projects. Effective scheduling is crucial in construction, as it aims to minimize process time, waiting time, and inventory levels while ensuring the efficient use of resources. The research is motivated by the frequent delays observed in high-rise building projects during the construction phase. The study employed SPSS to analyze data, revealing that the combined use of CCPM, BIM, and LPS significantly improves contractor performance and project implementation time, with a p-value of 0.000, indicating a strong influence. Specifically, the application of the CCPM method reduced the project timeline from 314 days to 235 days, achieving a 33.4% optimization in time. Additionally, the use of BIM 3D modeling facilitated rapid visualization of building progress across different floors, while the implementation of the LPS method improved the Percent Plan Completed (PPC) value from below 70% to 89.49%. The findings suggest that employing these methods enhances the accuracy of project timelines and reduces delays, offering valuable insights into improving construction project management practices.

References

Adriansyah, A. (2019). Faktor-Faktor Berpengaruh dalam Penerapan Critical Chain Project Management dan Building Information Modeling (BIM) 4D pada Pekerjaan Struktur Gedung Hunian Bertingkat Tinggi. Rekayasa Sipil, 8(1), 18–25.

Andiyan, A., Putra, R. M., Rembulan, G. D., & Tannady, H. (2021). Construction project evaluation using CPM-Crashing, CPM-PERT and CCPM for minimize project delays. Journal of Physics: Conference Series, 1933(1), 12096.

Aulady, M. F. N., & Orleans, C. (2016). Perbandingan Durasi Waktu Proyek Konstruksi AntaraMetode CriticalPathMethod (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut). Jurnal Iptek, 20(1), 13–24.

Darmanto, B., Widjayakusuma, J., & Simanjuntak, M. R. A. (2020). Identifikasi Faktor-Faktor yang Menyebabkan Cost Overrun pada Konstruksi Gedung Bertingkat. Prosiding Seminar Nasional Teknik Sipil UMS, 334–342.

Fitrianto, T., Wibowo, M. A., & Hatmoko, J. U. D. (2020). Pengukuran Kinerja Supply Chain pada Konstruksi Gedung Bertingkat dengan Menggunakan Pendekatan Metode SCOR (Supply Chain Operations Reference). Media Komunikasi Teknik Sipil, 26(1), 26–35.

Kholili, A. A., & Zuhdy, A. Y. (2023). Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Merial Tower 10 Lantai Rs. Pelni Jakarta Menggunakan Aluminium Formwork. Jurnal Teknik ITS, 12(1), D34–D39.

Rahayu, S., Yuliana, P. E., & Kelvin, K. (2022). Penerapan Metode CPM Dan CCPM untuk Perencanaan Sumber Daya Dan waktu Penyelesaian Multi Proyek. JISO: Journal Of Industrial And Systems Optimization, 5(2), 92–98.

Sabil, D. (2023). Penerapan Buidling Information Modeling (BIM) 5D pada Proyek Gedung Simpang Temu Dukuh Atas, Jakarta Pusat. Jurnal Teknik Sipil Dan Lingkungan, 8(2), 95–104.

Sinaga, T., & Husin, A. E. (2021). Analysis of Time Efficiency with CCPM Method and BIM in Construction Projects Construction of High-Rise Residential Building Basement. Civil Engineering and Architecture, 9(5), 1465–1477.

Taghipour, M., Seraj, F., Amin, M., & Changiz, D. M. (2020). Evaluating CCPM method versus CPM in multiple petrochemical projects. Management, 3(3), 1–20.

Tampubolon, U. D., Rahman, T., & Haryanto, B. (2021). Evaluasi Penjadwalan Proyek Konstruksi Dengan Metode Critical Chain Project Management (CCPM)(Studi Kasus: Proyek Pembangunan Pengganti Dan Fasilitas di Yonif 661/AWL Kompi Senapan Samarinda). Teknologi Sipil, 5(1), 30–43.

Yusdiana, E. D., & Satyawisudarini, I. (2018). Penerapan metode PERT dan CPM dalam pelaksanaan proyek pembangunan jalan paving untuk mencapai efektivitas waktu penyelesaian proyek. Almana: Jurnal Manajemen Dan Bisnis, 2(3), 20–30.

Downloads

Published

2025-03-20

How to Cite

Ariza, F., Suroso, A. ., & Amin, M. . (2025). Analysis of the Critical Chain Project Management (CCPM) method, BIM 3D, and Last Planner System on Contractor Performance and High Rise Building Project Duration. Eduvest - Journal of Universal Studies, 5(3), 2716–2730. https://doi.org/10.59188/eduvest.v5i3.1754